View Details
| Event Details | |
|---|---|
| ID | 11763 |
| Year | 1914 |
| Month | 01 (January) |
| Day | 09 (Friday) |
| Calendar | New |
| Quotation | Abbeystead Reservoir, River Wyre: "The particulars that have been supplied by the Water Engineer, show that the highest water level attained in the reservoir has been 3 feet 6 inches above the overflow sill. This was during the flood of January 9th, 1914, when 2.50 inches of rain were recorded in 24 hours at the Abbetstead Reservoir gauge. The fall on the upper parts of the gathering ground would no doubt be considerably heavier, as 3.70 inches was registered in the adjoining valley immediatey to the east of the watershed.The maximum rate of discharge at the dam over the overflow sill and through the two 36 in. scour pipes on this occasion, would be about 4,000 cusecs, which is equivalent to a run-off of one third of an inch per hour from the drainage area of 12,000 acres..... " |
| Source | Walter Mansergh ( 19 March 1934) Abbeystead Reservoir; Report [to Lancaster Corporation Waterworks, as owner]of an Inspection under Section 2 of the Reservoirs(Safety Provisions) Act 1930 page 4 |
| Area | 072 - Wyre and Lune |
| Contributor | Frank Law |
| Reference | James Mansergh (188/82) LANCASTER WATERWORKS EXTENSION. MINUTES OF PROCEEDINGS INST. CIVIL ENGINEERS, VOLUME 68, PART 2, PP253-277. |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 08/08/2001 14:56:36 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253