View Details

Event Details
ID12118
Year1875
Month11 (November)
Day15 (Monday)
CalendarNew
QuotationAbingdon Road railway bridge,Oxford, P 22:".... Following the November 1852 flooding of the Great Western Railway line the company decided to raise the rails by 0.35 metres (14 inches). However history repeated itself on 15th November 1875, when both lines of rails, still weld together by the fastenings of the sleepers, were swept bodily away from their position...." [Thames, or Isis]
SourceDerek M. Elsom (1987) Taming the Rivers of Oxford : a riverside walk. Oxford Region Thematic Trail No. 1 ISBN 0-948444-08-8
Area039 - Thames
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time31/12/2001 12:41:31

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password