View Details
| Event Details | |
|---|---|
| ID | 12419 |
| Year | 1947 |
| Month | 03 (March) |
| Day | 14 (Friday) |
| Calendar | New |
| Quotation | " .....The Thames topped its banks on 14th March as did other rivers....At Windsor the Borough Engineer Geoffrey Baker called a staff meeting, and arrangements were made to watch the river level at the Race Course and upstream, day and night. Soon the water spread southwards, checking for a while in Clewer at the ancient road line along the Balloon Meadow northern boundary, then rolling across Maidenhead Road and up Vale Road.There were only vague recollections from the oldest inhabitants about the disastrous flood of 1894, except one Oxford Road lady who said SHE had been flooded twice before and felt a bit old for a third inundation, so could she please be evacuated ...As the Goswell Road gasworks became flooded, a diver was sent for to open a valve on a small gas main linking to Slough, but this supply could not penetrate the water-filled mains of Windsor and Eton...The electric railway at Datchet became a canal between the platforms, as it did at Wraysbury. The Great Western line to Slough kept going, with its steam trains, but the coal yard was flooded and the water swirling around the arches looked ominous.....Along the river bank upstream, trees were in danger of being uprooted and swept away, thus putting Windsor Bridge, with its vital services, at risk, so the trees were blown up by a party of Scots Guards from Victoria Barracks. Arrangements were also made for this party to blow up any large boats that broke away from their moorings and swept downstream - as St Marks' "Ark" had been (see sketch in the Eton College "Deucalionea", page 3).....The roar and vibration from the mass of water passing under Windsor Bridge was alarming. Afterwards it was found that large round boulders had rolled downstream, swept along by the raging torrent, and a mass of sand and gravel had collected at Romney Weir.Clewer Village was an island around the church, Maidenhead Road was impassable by car, as were Vale Road, see above, Buckland Crescent, Rays Avenue, Arthur Road, Vansittart Road and Alma Road, north of Bexley Street. At the end of Bexley Street, the flood water was approximately 60cms (2') deep in The Bexley Arms and the water extended east to number 80.....Boats plied to and from the slope in Alma Road by what was then 'The Clarence Hotel', near what is now the 'Copper Horse' in Ward Royal. The latter is built upon the site of several streets that were flooded in 1894 and 1947, including Sydney Place, which was another embarkation place....Eton High Street was just passable but the wash from vehicles damaged shop fronts and doors..... Emergency work by guardsmen, called by Scots Guards radio by the Borough Engineer, erected clay dams from the Princess Avenue housing development site to protect the Eton Waterworks wells at Tangier Lane, and, even more vital, the electric power transformer. As this work was in full swing, Mr Gosling, an electricity board engineer, stood by to switch off as the water rose to within half an inch (1.2 cm) of the 'certain danger' level. The electric motors were kept running by this tiny margin and the water supply of Windsor and Eton was maintained. In 1894 the flood had stopped the pumps.....When the Borough Engineer personally cleared the baulks of timber closing the gap in the river wall at the Railway Arches in Barry Avenue, a torrent of impounded water swept the timbers away, as the river level had by then dropped well below the land flood level. Barry Avenue was the result of the flood protection work undertaken many years previously by Mayor Frederick Dyson,.... Town refuse had been tipped for a long period to raise the road level above that of Alexandra Gardens. In 1947 the latter remained a lake for many weeks after the rest of the flood water drained away, necessitating batteries of great pumps working night and day to clear it....[Afterwards] a prohibition on building in the flood area of Windsor was proposed and defeated, except that ground floor levels of new dwellings have to be at least as high as the 1947 level in the various areas." |
| Source | G.G.Cullingham, former Borough Engineer of Windsor (1981) The Floods of 1947. Windlesora Magazine, 1981 Web version accompanied by photos of [a] 1947 Flood Level Marker Plate on the steps of the Lock Keepers Cottage, Romney Island; [b] 1947 Flood Level |
| Area | 039 - Thames |
| Contributor | Frank Law |
| Reference | |
| Related URL | http://www.thamesweb.co.uk/windsor/windsorhistory/floods47.html |
| Geo Reference | |
| Entry Date/Time | 19/06/2002 12:33:20 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253