View Details

Event Details
ID12519
Year1894
Month11 (November)
Day12 (Monday)
CalendarNew
QuotationBristol: "On November 12, 1894, rain stopped at 4 p.m. and during the previous forty hours 2.40 inches fell, of which 1.40 inches fell in twelve hours, previous to 1.30 p.m. on the 12th; the Frome rose to 7 feet 1 inch above normal harbour level [19.78 feet Liverpool O.D.] at 2 p.m. and at 9 p.m. it was 10 feet 8 inches above. In the afternoon on the date mentioned, the floating harbour was lowered 2 feet below normal level, the sluices were closed at 5.27 p.m. and were opened at 7.7 p.m., a period of one hour and forty minutes; the greatest height to which it rose was 2 feet above normal level at 7.15 p.m."
SourceW.J.Steele, Deputy City Engineer (1901/02) " Floods Prevention Works in Bristol" Proc. Inc. Association of Municipal and County Engineers
Area053 - Avon (Bristol)
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time03/08/2002 14:59:56

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password