View Details

Event Details
ID12924
Year1922
Month08 (August)
Day07 (Monday)
CalendarNew
Quotation4 inches of rain fell at Tapton Grove in 2 days. 5.83 inches in 4 days at Linacre Reservoirs, which did not overflow. Storms and heavy rain brought flooding all over Derbyshire. The River Hipper overflowed its banks and poured down through Brampton in full flood. Much of Chatsworth Road and Factory Street were flooded. Water ran across the road and swamped the ground near to the Brampton Congregational Church. The cellars of New Inn were flooded and beer barrels floated out. Some parts of Brampton were cut off for 5 hours and all bank holiday sport was cancelled. Resident of Chatsworth Road had known nothing like it for 55 years. Worst floods in lower Chesterfield for 35 years. Some houses near Horns Bridge flooded up to ceilings. Houses on Lordsmill Street, Alma Square and Derby Road flooded.Chesterfield Sewage Works were swamped, and the low-lying land on the banks of the Rother and the Chesterfield Canal were inundated up to eight feet deep. Only slight damage to houses in this area, less than in previous years.River Whitting flooded Whittington Hill and houses in Cote road. Damage worse than previously known. Railway line damaged at Staveley, and roads blocked. Dronfield suffered worst flooding in 45 years. Houses and factories inundated on Monday and again on Tuesday.
SourceDerbyshire Times, 12 August 1922
Area027 - Ouse (Yorkshire)
ContributorDuncan Faulkner
Reference
Related URL
Geo Reference
Entry Date/Time30/01/2004 11:24:27

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password