View Details

Event Details
ID13054
Year1960
Month10 (October)
Day07 (Friday)
CalendarNew
QuotationHorncastle: On 7 October 1960 rain began to fall about 10.30 am. By 11 am it was torrential, and continued with little abatement until 5.00- 5.30 pm. The cumulonimbus storm cloud towered well above 40,000 ft over Horncastle. A total of 7.24 ins of rain in six hours fell on the town, and at Revesby Reservoir on the Haltham Beck 6.41 ins fell in three hours. At Hemingby, three miles above Horncastle, the Bain was running only half full, but the Waring and the Thunker Beck together were discharging four times as much water. And the flow in the little Haltham Beck four miles south of Horncastle was contributing more water than the normal discharge of the River Thames at Teddington. Although the old Canal had been cleaned and dredged as an auxiliary channel for the Bain water; silting was still evident on the canalised Waring, where the bed was sometimes within three feet of the level of the roadway. The Waring, the Bain and the old canal all proved inadequate to carry away the great volume of water. At noon the Waring began to overflow and, within two hours, the great quantity of water brought down by the Waring and Thunker, and by roads sloping to the river, was being discharged into the town. Many premises were flooded up to a depth of six feet, even eight feet in a few areas. At the time of maximum flow, caravans, timber from Prestwood's yard, and a car and a van were swept down the Waring; the debris formed temporary dams which increased the depth of flood water and played a part in carrying away two footbridges. Flooding on the Bain above its confluence with the Waring was due to ponding back, with discharge further impeded by the remains of the staunch doors.Below Horncastle the yalley was extensively flooded all the way to the confluence with the Witham at Dogdyke. By 8 o'clock that evening most of the streets of Horncastle were clear of water and by the next morning the Waring was well below bank-full. The remedial work which ensued - a deep concrete trough in place of the silt trap of the canalised Waring, improvements to the staunch and further work on widening and raising the banks of the old canal - were admitted as not capable of taking any size of flood at all. And so it proved in April 1981...."
SourceDavid N. Robinson @ http://www.visitoruk.com/horncastle/history/and_floods.htm
Area030 - Witham and Steeping
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time22/06/2004 16:01:11

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password