View Details
| Event Details | |
|---|---|
| ID | 7781 |
| Year | 1809 |
| Month | 01 (January) |
| Day | |
| Calendar | New |
| Quotation | "Bath Jan 28 At Chippenham the mail and other coaches were stopped and the letterd did not reach Bath. At Batheaston Bridge the two leaders of the Volunteer Coach were drowned. We have in the course of many years witnessed several overflowings of this river but never knew such devastation and misery as the present flood has produced. From the observations made near Monks Mill near the Grove we find that the high water Jan 1725 and the higher water Jan 25 1809 were so near in height that it is almost impossible to tell which was highest; if any the first by a quarter of an inch The great water flood in 1774 was not so high by two feet and a half"Twenty six persons were saved from cottages by makeshift rafts nad the use of a boat"An inquest was held on the bodies taken from under the ruins of the houses in Bedford Street; it is feared that others may remain undiscovered. Tenb bodies are already found" |
| Source | Warwickshire Advertiser 4 Feb 1809 |
| Area | 053 - Avon (Bristol) |
| Contributor | David Archer |
| Reference | |
| Related URL | |
| Geo Reference | 51.382040, -2.368671 |
| Entry Date/Time | 08/01/1999 19:59:30 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253