1251912-11-1894Bristol: "On November 12, 1894, rain stopped at 4 p.m. and during the previous forty hours 2.40 inches fell, of which 1.40 inches fell in twelve hours, previous to 1.30 p.m. on the 12th; the Frome rose to 7 feet 1 inch above normal harbour level [19.78 feet Liverpool O.D.] at 2 p.m. and at 9 p.m. it was 10 feet 8 inches above. In the afternoon on the date mentioned, the floating harbour was lowered 2 feet below normal level, the sluices were closed at 5.27 p.m. and were opened at 7.7 p.m., a period of one hour and forty minutes; the greatest height to which it rose was 2 feet above normal level at 7.15 p.m."053 - Avon (Bristol)Frank Law
1252031-12-1900Bristol: "On December 31, 1900, when 1.68 inches of rain fell in eighteen hours before 4 a.m., the Frome rose to 11 feet 3 inches above normal harbour level at 9 a.m., and discharged for a period of three hours, 9 million cubic feet per hour; owing to neap tides being prevalant, the flood water in the harbour ran through the sluices as fast as it came down."053 - Avon (Bristol)Frank Law
1252124-10-1882Bristol: "...thre great flood of October 1882, which attained its maximum height about 10 p.m. on the 24th of that month. He [ Mr Howard] estimated the quantity of water ponded in the flooded district within and above the city boundary at about 27 million cubic feet, and the area covered by flood to be 125 acres..." 053 - Avon (Bristol)Frank Law
125221890"The Bristol (River Frome) Act was obtained in 1887, by which powers were granted to construct certain works, of which the following were carried out: a relief culvert 156 yards in length 12 feet wide and 7 feet 6 inches high, from the river Frome at a point about 1200 yards above its mouth, to the floating harbour; the waterway was widened and deepened at various points....an ancient archway was reconstructed; new sluices were provided in the floating harbour...These works were completed in 1890 at a cost of £42,779....The Bristol Floods Prevention Act, 1890, was obtained to improve the channel of the Frome, to construct the Black Rock culvert, and to make improvements in the Malago brook. "053 - Avon (Bristol)Frank Law
125231845Whittle Dene "...the Company wrote to the Duke of Northumberland....to the effect that Grainger....wished to construct ' a small dam -- six or eight feet in length and two or three feet high -- across the stream ...for the purpose of gauging the quantity of water which the runner is capable of supplying.' ...gaugings were carried out from 9 January 1845 until April 1846, by which time construction was under way. During the seven month period from [9 January 1845] the average stream flow had amounted to 5 m.g.d. [million gallons per day] " [Whittle Burn]023 - Tyne (Northumberland)Frank Law
125241847Whittle Dean reservoirs construction, 4340 acre catchment:"...superintendent, William Reid...resident at Whittle Dean from April 1846 to May 1847, the period in which the major part of the work was carried out. ...Other than the washing-out of a partially formed embankment due to floods following a thaw, problems were principally due to poor workmanship...In spite of problems, completion was achieved by November 1847...and the reservoirs were brought into use in April 1848." [Whittle Burn]023 - Tyne (Northumberland)Frank Law
125251850Whittle Dean reservoirs: " ....satisfactory performance of the reservoirs...until 1850 when, due to a summer of low rainfall, storage fell [from 215 million gallons] to less than 40 mill. galls." 023 - Tyne (Northumberland)Frank Law
125261862"In a later report Bateman [noted rainfall] figures for the period October 1861 to February 1862 [as] being 7.78 ins. at Whittle Dean,9.44 in Hallington Village and 10.18 at Woodford; the mean of the several Hallington readings was 9.91, an increase of 27% over Whittle Dean. As a result of his gaugings Bateman postulated the dry year rainfall at Hallington as about 24 ins.p.a., comparing this with the 19.5 ins. experienced at Whittle Dean in the dry years of 1850 and 1851." [Hallington North Burh]022 - Coquet GroupFrank Law
125271851"In a later report Bateman [noted rainfall] figures for the period October 1861 to February 1862 [as] being 7.78 ins. at Whittle Dean,9.44 in Hallington Village and 10.18 at Woodford; the mean of the several Hallington readings was 9.91, an increase of 27% over Whittle Dean. As a result of his gaugings Bateman postulated the dry year rainfall at Hallington as about 24 ins.p.a., comparing this with the 19.5 ins. experienced at Whittle Dean in the dry years of 1850 and 1851." [Hallington North Burh]023 - Tyne (Northumberland)Frank Law
125281983"Ashford (SK 195697) is situated on the north bank of the River Wye....Flooding began on the evening of 22 April in response to heavy rainfall, and was repeated on the 25 and 26 April and in each instance large quantities of silt were deposited on roads, and in gardens and houses....Low-lying properties on the floodplain of the Wye were inundated by up to 20 cm of 'sludge'.....The[Derbyshire Toimes] reports suggest that in excess of 100 tons of mud were removed from roads and properties..."Ednaston (Sk 239415)is...in the valley of Brailsford Brook, a minor tributary of Sutton Brook...On 22 April 1983 runoff from a field [of potatoes] to the north-west of the Yew Tree Inn flooded the inn and adjacent cottages....Water and soil left the field via a gate at the lowest point in the field. Flooding affected the properties on three occasions in April.... The soli is a sandy loam..."[Fig 4 gives April daily rainfalls and Figs 5 and 6 show tipping bucket rainfall intensity hyetographs for flood days]028 - TrentFrank Law